Renovating an apartment in Monaco: a practical guide
Before drawing a new layout, establish what the apartment can accommodate, what its occupants need and what the building allows. These pointers help prepare a first conversation without assuming an authorization, price or timetable.
Editorial responsibility: Monaco Private · Cécile Dupré, architecte HMONP. Revised .

Owner decision checklist
Use this checklist to prepare decisions and identify what still needs verification. It is a preparation aid, not a substitute for a survey or the checks required for the property.
- Property and priorities: record the property type, current use, occupants, rooms to retain or transform and the three outcomes that matter most.
- Available documents: list dated plans, photographs, building rules and maintenance or previous-works information, distinguishing originals from copies.
- Uncertainties: mark structure, risers, drainage, ventilation, levels and service access that remain unverified.
- Budget priorities: state the envelope if known and what should take precedence or be deferred; this does not replace contractor quotes.
- Decision-maker and approvals: name who decides, who must be consulted and how written or remote approvals will be recorded.
Use the apartment renovation scope for surveys, relocation feasibility and contractor consultation, and the interior architecture scope for joinery, lighting and remote approvals.
Define uses before finishes
List the rooms you need, who will use them and what must remain. Consider storage, working from home, guests, accessibility and the relationship between living and sleeping spaces.
Rank priorities rather than assuming everything can be changed. The brief provides a basis for comparing layout options and deciding where a detailed technical study is necessary.
Read the existing building
Existing plans, a survey and available maintenance information help locate structure, risers and services. An image or old plan does not establish whether a wall can be removed or a bathroom relocated.
Discuss access, lift dimensions, deliveries, protection of shared areas, noise and permitted working hours with building management. These arrangements depend on the building rather than on a universal construction calendar.
Connect plans, sections and views before renovating
A layout option needs to be read in three ways before it is chosen. The plan locates uses, circulation and furniture footprints; the section reveals ceiling heights, level changes and the space occupied by fittings; the view shows what is visible from an entrance, a seat or a passage. Comparing them helps identify an arrangement that works on paper but obstructs a sightline or constricts a volume.
Choose the views that matter in everyday use: arriving in the living room, looking out from a table, moving between rooms. Check the position of openings, partitions and tall joinery against those views. An opening that looks aligned on plan may be partly concealed by a bulkhead or a cabinet when read in section and from the intended viewpoint.
Assess daylight in depth, not only at the window. Follow its path towards the back of the room and compare the effect of partitions, recesses and storage. A view can clarify the relationship between a bright frontage and a deeper space, but does not replace checking orientation, external obstructions and light conditions in the property.
Draw storage and equipment together with the room: cabinet depth, door swings, appliances, ventilation and maintenance access. Check which elements need to remain accessible and which can be integrated into joinery. The decision is not simply whether a cabinet fits on plan, but whether it can be used without obstructing circulation or concealing a technical access point.
Where there is a terrace, read the interior and exterior together. Compare sightlines, furniture placement, opening movements, thresholds and differences in level. Before choosing a continuous layout or floor treatment, verify the existing junction, drainage and the building constraints; a visual connection does not establish that the threshold can be altered.
Record the checks needed for each option on the measured survey: actual heights and levels, wall and opening positions, structure, service routes and junctions with the exterior. Separate what has been measured from what remains to be investigated. Choose the layout once its spatial intent and technical uncertainties can be discussed together, rather than treating a persuasive view as proof of feasibility.
Separate qualification, professional practice and works approval
Monaco's framework for architectural practice includes Ordinance-Law no. 341 of 24 March 1942. A professional qualification such as HMONP is not the same as an applicable local authorization. Verify the professionals' responsibilities and requirements for the intended mission.
Works authorizations and co-ownership agreements are distinct from professional qualifications and depend on the proposed intervention and property. Confirm the applicable requirements with the competent authorities and building management before starting.
Official source: Ordinance-Law no. 341 of 24 March 1942, Legimonaco
Saint-Cloud: an interior organisation reference in France
The SHTEPI design at Saint-Cloud connects the open kitchen and living room around an island and continuous parquet. This French reference illustrates work on circulation and joinery junctions.
Saint-Cloud apartment — design by SHTEPI, France · Frame an apartment renovation study · Request a study
Make decisions in stages
First review the property and agree the brief. Feasibility and layout options then identify what can be retained, changed or investigated further. Developed design sets out materials, joinery, lighting and technical interfaces.
Consultation drawings and descriptions allow contractor offers to be compared on a defined scope. Where site supervision forms part of the mission, agreed validations and written records support coordination through handover. Cost and duration must be established from the actual scope and offers.
Prepare the first conversation
A few lines about the property, desired changes, intended use, priorities and decision-makers are enough to start. If the budget is not yet defined, say so rather than selecting an unsuitable range.
Gather existing plans and photographs if available, but share sensitive documents only through a channel agreed later. The visual collection offers inspiration for discussing volumes, materials and light.
Cécile Dupré and the studio · Visual references / inspiration · Start a conversation
FAQ
Frequently asked questions
Does an apartment renovation need authorization?
Depending on the works, the building and the applicable rules, prior agreements or authorizations may be required. Check the situation with building management and the competent authorities before starting.
What should I prepare for a first conversation?
A short description of the property, what you want to change, the intended use and any budget priorities is enough to begin. Plans and photographs can be shared later through an agreed channel; do not send sensitive documents through the initial form.
How is the project organized?
The usual decision sequence is a review of the existing property, feasibility and layout options, developed design, applicable procedures, contractor consultation and, if included in the mission, site supervision and handover. Scope and timing are defined for the actual property.
Does HMONP establish a right to practise in Monaco?
No. HMONP is a professional qualification, distinct from the local framework governing architectural practice in Monaco. Applicable authorizations and professional responsibilities must be checked for the proposed mission.